

LICKING RIVER STREAM MITIGATION BANK SITE
41,964 Linear Feet | Nicholas County | Construction Completed in 2023
Natural channel design was used for stream re-establishment on perennial, intermittent, and ephemeral streams at the watershed scale. Re-establishment included construction of grade control structures in the form of riffles, vanes and habitat features such as toe-woods. Enhancement of ephemeral streams included invasives species management.

